Case Studies
Lindhurst
This project involved 2 HV connections, 4 LV. Lindhurst Lindhurst June 2021 This project involved 2 HV connections, 4 LV. Project Gallery
Uttoxeter
1.4 kilometres – 11kV overlay scheme. Uttoxeter Uttoxeter June 2021 1.4 kilometres – 11kV overlay scheme. Project Gallery
Sheepbridge
3.5 kilometres – 11kV new connection. Sheepbridge Sheepbridge June 2021 3.5 kilometres – 11kV new connection. Project Gallery
Grantham
New 2.6 kilometres – 33kV overlay supply. Grantham Grantham June 2021 New 2.6 kilometres – 33kV overlay supply. Project Gallery
Barn Farm, Ruddington
New 1.8 kilometres – 11kV supply plus water main. Barn Farm, Ruddington Barn Farm, Ruddington June 2021 New 1.8 kilometres – 11kV supply plus water main. Project Gallery
Yorkshire Premier Meats
New HV supply – including a new plinth and civils work.
Red Tile Wind Farm, Cambs
This project involved the installation of 8km of 33KV ducted cable.
Long Park Wind Farm, Galashiels
This project involved the installation of 14km of 33KV (lay only) ducted cable.
St Georges Park, Burton
This project involved installing 10km of 11KV ducted cable.
Great Haddon, Peterborough
This project involved the installation of 4km of double circuit 33KV ducted cable.