Case Studies
![ISO ISO](https://vuslimited.co.uk/wp-content/uploads/2024/04/ISO.jpg)
![NERS-NEW NERS-NEW](https://vuslimited.co.uk/wp-content/uploads/2021/12/NERS-NEW.jpeg)
![Achilles Assessed - UVDB Achilles Assessed - UVDB](https://vuslimited.co.uk/wp-content/uploads/2021/06/Achilles-UVDB-Assessed-Logo.png)
![European Union (EU) - European Regional Development Fund European Union (EU) - European Regional Development Fund](https://vuslimited.co.uk/wp-content/uploads/2021/06/European.png)
![case study-07 case study-07](https://vuslimited.co.uk/wp-content/uploads/2021/06/case-study-07-1.png)
Lindhurst
This project involved 2 HV connections, 4 LV. Lindhurst Lindhurst June 2021 This project involved 2 HV connections, 4 LV. Project Gallery
![case study-06 case study-06](https://vuslimited.co.uk/wp-content/uploads/2021/06/case-study-06-1.png)
Uttoxeter
1.4 kilometres – 11kV overlay scheme. Uttoxeter Uttoxeter June 2021 1.4 kilometres – 11kV overlay scheme. Project Gallery
![case study-09 case study-09](https://vuslimited.co.uk/wp-content/uploads/2021/06/case-study-09-1.png)
Sheepbridge
3.5 kilometres – 11kV new connection. Sheepbridge Sheepbridge June 2021 3.5 kilometres – 11kV new connection. Project Gallery
![case study-10 case study-10](https://vuslimited.co.uk/wp-content/uploads/2021/06/case-study-10-1.png)
Grantham
New 2.6 kilometres – 33kV overlay supply. Grantham Grantham June 2021 New 2.6 kilometres – 33kV overlay supply. Project Gallery
![case study-08 case study-08](https://vuslimited.co.uk/wp-content/uploads/2021/06/case-study-08-1.png)
Barn Farm, Ruddington
New 1.8 kilometres – 11kV supply plus water main. Barn Farm, Ruddington Barn Farm, Ruddington June 2021 New 1.8 kilometres – 11kV supply plus water main. Project Gallery
![case study-11 case study-11](https://vuslimited.co.uk/wp-content/uploads/2021/06/case-study-11-1.png)
Yorkshire Premier Meats
New HV supply – including a new plinth and civils work.
![featured-2 featured-2](https://vuslimited.co.uk/wp-content/uploads/2021/06/featured-2.jpg)
Red Tile Wind Farm, Cambs
This project involved the installation of 8km of 33KV ducted cable.
![Feature Feature](https://vuslimited.co.uk/wp-content/uploads/2021/06/Feature.jpg)
Long Park Wind Farm, Galashiels
This project involved the installation of 14km of 33KV (lay only) ducted cable.
![featured-1 featured-1](https://vuslimited.co.uk/wp-content/uploads/2021/06/featured-1.jpg)
St Georges Park, Burton
This project involved installing 10km of 11KV ducted cable.
![Featured2 Featured2](https://vuslimited.co.uk/wp-content/uploads/2021/06/Featured2.jpg)
Great Haddon, Peterborough
This project involved the installation of 4km of double circuit 33KV ducted cable.